Padside
Menu

Indian Space Research OrganizationPSLV XLSatish Dhawan Space Centre First Launch Pad, Satish Dhawan Space Centre, India

Proba-3

Launched

December 5, 2024 · 10:34 UTC

Launch Successful
Proba-3 mission patch

Image: ISRO

Summary

Proba-3 launched on an Indian Space Research Organization PSLV XL from Satish Dhawan Space Centre First Launch Pad, Satish Dhawan Space Centre, India on December 5, 2024 at 10:34 UTC. It was Indian Space Research Organization's 92nd launch, 4th this year and humanity's 6,826th orbital launch attempt. It was the 26th PSLV XL flight and the 1st this year. The payload was bound for Elliptical Orbit (Elliptical). PROBA-3 CSC, one of 3 catalogued objects, reached a 580 × 60,570 km orbit inclined 59.2°. 3 objects from this launch are catalogued, 2 of them payloads.

Watch
Booster
No booster details on record.
Mission
Technology · Elliptical Orbit (Elliptical)
Milestone
26th PSLV XL flight · 1st this yearIndian Space Research Organization's 92nd launch4th this yearhumanity's 6,826th orbital launch attempt237th orbital launch attempt this year

Webcast

Replay
Watch on YouTube

Flight preview

Orbit: as tracked

59.2°Inclination
580 × 60570 kmPerigee × apogeefrom mean elements
1177.9 minPeriodfrom mean elements
146.6°Ascending node
679 d agoElement epoch2024-12-05 14:56 UTC · stale

PROBA-3 CSC · NORAD 62256 · 2024-233 · Space-Track · tracking 1 of 3 objects

Show the numbers for orbit elements
Object
TBA - TO BE ASSIGNED
Object ID
2024-233A
Epoch
2024-12-05 14:56:49 UTC
Mean motion
1.22249642 rev/day
Eccentricity
0.8118486
Inclination
59.185°
Ascending node
146.5864°
Arg. of perigee
187.9932°
Mean anomaly
76.7736°
Element set
999
Rev at epoch
0
B*
0

Perigee, apogee and period are Kepler figures from the catalogued mean elements, not a propagated state. Published orbit: Elliptical. Ascent drawn from padside's representative profile.

Flight timeline

14 steps, T−3 s to T+18 min 42 s
  1. T−3SIgnition
  2. T−0Booster Ignition
  3. T+1SLiftoff
  4. T+25SBooster Ignition
  5. T+1M10.1SBooster Separation
  6. T+1M32SBooster Separation
  7. T+1M49.7SStage 2 Separation
  8. T+1M49.9SSES
  9. T+4M22.38SStage 2 Separation
  10. T+4M23.58SStage 3 Ignition
  11. T+8M9.22SStage 3 Separation
  12. T+8M19.62SKick Stage Ignition
  13. T+16M55.48SKick Stage Cut-off
  14. T+18M42.48SPayload Separation

Catalogued objects

3 catalogued: 2 payloads, 1 rocket stage; 3 still in orbit

  • PROBA-3 CSC · NORAD 62256 · in orbit
  • PROBA-3 OSC · NORAD 62258 · in orbit

PSLV-C59 PS4 · in orbit

Data from J. McDowell, planet4589.org

About this launch

Proba-3 (Project for On-Board Autonomy 3) is the first close formation flying mission for the European Space Agency (ESA). It consists of two independent, three-axis stabilised spacecraft flying 150 meters from one another with the ability to accurately control the attitude and separation of the two craft. Such formation flying will be maintained for 6 hours, creating ″artificial solar eclipse″ for the satellite below. The spacecraft pair will fly a highly elliptical orbit divided between periods of accurate formation flying around apogee, when payload operations will be possible, and periods of free flight.

News

3 stories

Pad

Map of Satish Dhawan Space Centre First Launch Pad

Satish Dhawan Space Centre First Launch Pad, Satish Dhawan Space Centre, India

60th launch from Satish Dhawan Space Centre First Launch Pad, 3rd this year · 96th from Satish Dhawan Space Centre, India

Local pad time at liftoff: Dec 5, 4:04 PM GMT+5:30, in daylight

64 launches from this pad · 105 from Satish Dhawan Space Centre, India

111 days after the previous launch from this pad

Updates

Spacecrafts now in contact.

Show 9 earlier updates
  • Spacecraft separation.

    Cosmic_Penguin · 12/5/2024 · source

  • Liftoff.

    Cosmic_Penguin · 12/5/2024 · source

  • Official Webcast by ISRO Official has started

    LL2 · 12/5/2024 · source

  • Tweaked new launch time.

    Cosmic_Penguin · 12/4/2024 · source

  • Scrub due to spacecraft issue.

    Cosmic_Penguin · 12/4/2024 · source

  • Tweaked T-0.

    Cosmic_Penguin · 11/28/2024 · source

  • Updated launch time.

    Cosmic_Penguin · 11/1/2024 · source

  • NET December 4.

    Cosmic_Penguin · 10/31/2024 · source

  • NET November 29.

    Cosmic_Penguin · 10/4/2024 · source

Questions

When did Proba-3 launch?

Proba-3 launched on December 5, 2024 at 10:34 UTC.

Where can I watch Proba-3?

Coverage: PSLV-C59/PROBA-3 Mission. Watch the replay

What rocket launched Proba-3?

PSLV XL, flown by Indian Space Research Organization. PSLV XL spec sheet

Where did Proba-3 launch from?

Satish Dhawan Space Centre First Launch Pad, Satish Dhawan Space Centre, India. Liftoff was Dec 5, 4:04 PM GMT+5:30 local time at the pad.

What orbit did Proba-3 reach?

PROBA-3 CSC, one of 3 catalogued objects, reached a 580 × 60,570 km orbit inclined 59.2°.

How many satellites did Proba-3 launch?

2 payloads from this launch are catalogued, 2 of them still in orbit (Data from J. McDowell, planet4589.org).