
PSLV-XL | EOS-09 (RISAT-1B)
Indian Space Research Organization · PSLV XL · Satish Dhawan Space Centre First Launch Pad, Satish Dhawan Space Centre, India
Indian Space Research Organization's 95th launch · 2nd this year · humanity's 6,957th orbital launch attempt
Either the launch vehicle did not reach orbit, or the payload(s) failed to separate.
Window: May 18, 00:00 – May 18, 04:00 UTC
Flight preview
EOS-09 (RISAT-1B)
RISAT-1B is the third in the series of radar imaging RISAT-1 satellites of ISRO using an active C-band SAR (Synthetic Aperture Radar), providing all-weather as well as the day-and-night SAR observation capability in applications such as agriculture, forestry, soil moisture, geology, sea ice, coastal monitoring, object identification, and flood monitoring, in addition to military surveillance. The RISAT-1 series is developed, manufactured and integrated by ISRO. The 3-axis stabilized spacecraft bus consists of a hexagonal prism shape build around a central cylinder. Most of the spacecraft subsystems and the payload are integrated in the prism structure and the central cylinder. The solar panels and some subsystems are mounted on the cube-shaped section of the spacecraft.
Government/Top Secret · Sun-Synchronous Orbit (SSO)
Booster
No booster details available.
Watch
- ISRO’s 101st Launch | PSLV-C61 / EOS-09 | 18 May 2025 — ISRO Official
Flight timeline
- T−3SRCT Ignition
- P0DIgnition
- T+0.42SBooster Ignition
- T+0.62SBooster Ignition
- T+25SBooster Ignition
- T+1M9.9SBooster Separation
- T+1M10.1SBooster Separation
- T+1M32SBooster Separation
- T+1M51.64SStage 2 Separation
- T+1M51.84SSES
- T+2M32.78SFairing Separation
- T+2M37.78SCLG Start
- T+4M24.34SStage 3 Separation
- T+4M25.54SStage 3 Ignition
- T+8M13SKick Stage Separation
- T+8M23.4SKick Stage Ignition
- T+16M52.24SKick Stage Cut-off
- T+17M39.24SPayload Separation
- T+37M11.52SKick Stage Ignition
- T+45M56.78SKick Stage Cut-off
- T+1H22M32.52SKick Stage Ignition
- T+1H31M2.04SKick Stage Cut-off
- T+1H32M52.04SMON Passivation
- T+1H41M52.04SMMH Passivation
Updates
Launch failure.
Cosmic_Penguin · 5/18/2025 · source
Liftoff.
Cosmic_Penguin · 5/18/2025 · source
Official Webcast by ISRO Official has started
LL2 · 5/18/2025 · source
Adjusted T-0.
Cosmic_Penguin · 5/15/2025 · source
Added launch time.
Cosmic_Penguin · 5/8/2025 · source
Added launch window, NET May 18.
Cosmic_Penguin · 5/1/2025 · source
NET May 19.
Cosmic_Penguin · 4/29/2025 · source
Added launch.
Cosmic_Penguin · 4/18/2025 · source
Pad — Satish Dhawan Space Centre First Launch Pad
Local pad time: May 18, 5:59 AM GMT+5:30
64 launches from this pad · 104 from Satish Dhawan Space Centre, India
Open in maps