Padside

Image: SpaceX

Falcon 9 Block 5 | NAOS

NAOS

SpaceX · Falcon 9 Block 5 · Space Launch Complex 4E, Vandenberg SFB, CA, USA

SpaceX's 556th launch · 107th this year · humanity's 7,043rd orbital launch attempt

T− --:--:--August 26, 2025 · 18:53 UTCAdd to calendar
Success

The launch vehicle successfully inserted its payload(s) into the target orbit(s).

Window: Aug 26, 18:53Aug 26, 19:20 UTC

Flight preview

Simulate in Flight Club ↗

NAOS

NAOS (National Advanced Optical System) is the space component of Luxembourg's governmental dual-use observation satellite system LUXEOSys (Luxembourg Earth Observation System). Its purpose is to provide high resolution images to national and international governmental and military organizations such as NATO. The 800 kg satellite is built by OHB Italia and is equipped with a very high-resolution optical camera with a ground reolution of 50 cm in an around 450 km high sun-synchronous orbit. It will have a operational life time of 7 years. Also on board the launch is Dhruva Space's LEAP-1; Planet's Pelican-3 and Pelican-4; and Exolaunch’s Acadia-6, FFLY-1, FFLY-2, and FFLY-3.

Government/Top Secret · Sun-Synchronous Orbit (SSO)

Booster

  • B1063 · flight 27 · Return to Launch Site @ Landing Zone 4 · landed ✓ · last flew Falcon 9 Block 5 | Starlink Group 11-22 · zone record 35/35

Watch

Flight timeline

  1. T−38MGO for Prop Load
  2. T−35MStage 1 LOX Load
  3. T−35MProp Load
  4. T−16MStage 2 LOX Load
  5. T−7MEngine Chill
  6. T−1MTank Press
  7. T−1MStartup
  8. T−45SGO for Launch
  9. T−3SIgnition
  10. P0DLiftoff
  11. T+1M12SMax-Q
  12. T+2M14SMECO
  13. T+2M18SStage 2 Separation
  14. T+2M22SStage 1 Flip
  15. T+2M25SSES-1
  16. T+2M31SBooster Boostback Burn Startup
  17. T+2M41SFairing Separation
  18. T+3M18SBooster Boostback Burn Shutdown
  19. T+6M14SEntry Burn Startup
  20. T+6M35SEntry Burn Shutdown
  21. T+7M20SStage 1 Landing Burn
  22. T+7M57SStage 1 Landing
  23. T+9M29SSECO-1
  24. T+11M42SPayload Separation
  25. T+11M48SPayload Separation
  26. T+11M55SPayload Separation
  27. T+52M34SSES-2
  28. T+52M37SSECO-2
  29. T+1H5M55SSES-3
  30. T+1H5M59SSECO-3
  31. T+1H8M50SPayload Separation
  32. T+1H8M58SPayload Separation
  33. T+1H9M7SPayload Separation
  34. T+1H9M16SPayload Separation
  35. T+1H9M26SPayload Separation

Updates

  • Successful deployment of all payloads

    Nosu · 8/26/2025 · source

  • Liftoff

    Nosu · 8/26/2025 · source

  • Unofficial Re-stream by SPACE AFFAIRS has started

    LL2 · 8/26/2025 · source

  • Adding seconds to T-0

    Nosu · 8/26/2025 · source

  • GO for launch.

    Cosmic_Penguin · 8/18/2025 · source

  • NET 1H 2025.

    Cosmic_Penguin · 12/9/2024 · source

  • Launch vehicle switched from Vega-C to Falcon 9.

    Cosmic_Penguin · 2/24/2024 · source

  • Vega-C RTF NET 2024.

    Cosmic_Penguin · 4/18/2023 · source

  • Satellite testing is planned for November, launch is no earlier than that.

    spacevogel · 2/17/2022 · source

Pad — Space Launch Complex 4E

Local pad time: Aug 26, 11:53 AM PDT

283 launches from this pad · 899 from Vandenberg SFB, CA, USA

Map of Space Launch Complex 4EOpen in maps