
Image: Rocket Lab
Electron | Bridging The Swarm (NeonSat-1A)

Rocket Lab · Electron · Rocket Lab Launch Complex 1A, Rocket Lab Launch Complex 1, Mahia Peninsula, New Zealand
Rocket Lab's 81st launch · 2nd this year · humanity's 7,195th orbital launch attempt
The launch vehicle successfully inserted its payload(s) into the target orbit(s).
Window: Jan 29, 22:45 – Jan 30, 02:00 UTC
Flight preview
Bridging The Swarm (NeonSat-1A)
The NeonSat-1A, carrying a high-resolution optical camera, is designed to test the constellation capabilities of the South Korean government's Earth observation micro-satellite constellation NeonSat (New-space Earth Observation Satellite), in particular technology improvements identified from operations of NeonSat-1 after its launch in April 2024. These technologies will in turn be incorporated into the next 10 NeonSat under construction, as well as providing more site re-visiting capabilities along with NeonSat-1. The NeonSat constellation is the first satellite system developed by the government using a mass-production approach for precise monitoring of the Korean Peninsula, lead by the Satellite Technology Research Center (SaTReC) at the Korea Advanced Institute of Science and Technology (KAIST), Korea’s leading university dedicated to science and technology. Designed to capture near-real time natural disaster monitoring for the Korean peninsula, KAIST’s NEONSAT constellation is a collaboration across multiple Korean academic, industry, and research institutions, including SaTReC, which is leading the program’s system design and engineering. The NEONSAT program is funded by the Korean government’s Ministry of Science and ICT (MSIT).
Earth Science · Sun-Synchronous Orbit (SSO)
Booster
No booster details available.
Watch
- Rocket Lab - 'Bridging The Swarm' Launch — Rocket Lab
- 국내 최초 양산형 초소형 군집위성 검증기 발사 생중계 — 우주항공청 KASA
Flight timeline
- T−2MStartup
- T−2SIgnition
- P0DLiftoff
- T+56SSupersonic
- T+1M7SMax-Q
- T+2M37SMECO
- T+2M40SStage 2 Separation
- T+2M43SSES
- T+3M41SFairing Separation
- T+6M35SBattery Hotswap
- T+9M7SSECO
- T+9M11SKick Stage Separation
- T+51M13SKick Stage Ignition
- T+53M8SKick Stage Cut-off
- T+53M58SPayload Separation
Updates
Launch success.
Cosmic_Penguin · 1/30/2026 · source
Spacecraft separation.
Cosmic_Penguin · 1/30/2026 · source
Official Webcast by Rocket Lab has started
LL2 · 1/30/2026 · source
Liftoff.
Cosmic_Penguin · 1/30/2026 · source
New T-0.
Cosmic_Penguin · 1/30/2026 · source
Hold at T-08:59.
Cosmic_Penguin · 1/30/2026 · source
Updated launch weather, 70% GO.
Cosmic_Penguin · 1/30/2026 · source
GO for launch.
Cosmic_Penguin · 1/29/2026 · source
Delayed to NET January 30.
Cosmic_Penguin · 1/27/2026 · source
NET January 28 UTC, to be confirmed as for this launch.
Cosmic_Penguin · 1/24/2026 · source
Pad — Rocket Lab Launch Complex 1A
Local pad time: Jan 30, 2:21 PM GMT+13
41 launches from this pad · 78 from Rocket Lab Launch Complex 1, Mahia Peninsula, New Zealand
Open in maps